TOM CORCORAN FARM – CATTLE SLATS
READY MIX CONCRETE – BRETT BROTHERS
This project is a grain store, it is for Brett Brothers in Callan and the main contractors are the McCarthy Brothers from Kilkenny. We are here to supply ready mix concrete and we are using our pumping service to pump all the concrete into place. It is a long reach and this really the only way it
PIGGERY, DUNGARVAN – READY MIX CONCRETE
Ready mix concrete supplied and pumped in to place by our Concrete Pump Truck for the floor in a very large effluent tank for collecting pig slurry the walls will be poured in the next few weeks.
OLD BELL AND SALMON HOTEL IN CARRICK ON SUIR
This was a balcony on the back of the old Bell and Salmon Hotel in Carrick on Suir, we supplied the Pump and the Concrete the customer supplied the Dye for the concrete which was mixed in our Plan in Hugginstown and then pumped into place over two different days as you can see the
EASY FLOW CONCRETE TO BALLYHALE CO. KILKENNY FOR JOHN CORCORAN CONSTRUCTION LTD
This job took place in a existing house where the customer was replacing an old damaged floor with our finished floor. Doyle Concrete crew arrived on site and set up levels etc for the Easy Flow Concrete, our pump truck then arrived on site and another truck they proceeded to pour the self levelling concrete
FINISHED FLOOR FOR THE RESTAURANT EXTENSION AT THE STRAND HOTEL IN DUNMORE EAST
This was an Extension to an existing building where we did the finished floor, The Doyle Concrete crew arrived on site and set up levels etc for the Easy Flow Concrete, our pump truck then arrived on site and another truck they proceeded to pour the self levelling concrete mix and the crew finished the
NEW FLOOR IN EXISTING BUILDING AND A NEW EXTENSION IN IRISHTOWN KILKENNY
Doyle Concrete crew arrived on site and set up levels etc for the Easy Flow Concrete, our pump truck then arrived on site and another truck they proceeded to pour the self levelling concrete mix and the crew finished the floor.
NEW THAI RESTAURANT & B&B, MAIN ST, MULLINAVAT, CO. KILKENNY
The job was quite a big job and it consisted of 3 floors. We supplied pre stressed 150mm floors and 4 flights of concrete stairs. Due to the scale for this project and accessibility of our concrete pumping truck was a great assistance in completing this project. This project required 30m3 per story. In total there
FLOOR SCREED, NEW BUILD HOUSE, WITCHES LANE, BUTLERS TOWN, COUNTY WATERFORD
This job consisted approximately 120m2 at 75 mm depth of our easy flow concrete. This involved 2 loads of one truck, pump truck and the Doyle concrete crew.
ANYTHING IS POSSIBLE WITH GOOD NEIGHBOURS AND THE WILLING DOYLE CONCRETE CREW
Description : This 2 story dwelling with access in the heart of Kilkenny city. With the willing neighbors and the skilled crew we managed to complete this job on a Saturday morning. 6 meters of concrete was used in this project.
LEFT BANK KILKENNY
Doyle Concrete Trucks and Crew arrived on Site @ 7.00 am and set up. We pumped the Floor Screed through the beer garden entrance for the New Floor in the Restaurant and the Long Awaited Ladies Toilets on the Ground Floor in the very popular Left Bank Bar located in the Heart of Kilkenny City.
FLOOR SCREED DUNNAMAGGIN PHASE 2
2Nd Screed Job of the Day. The Crew continued back to Dunnamaggin for the next Screed Floor, this was a continuation of the job down stairs. The Screed was covering underfloor heating system this product is ideal for this purpose. We had done the 1st floor screed job the previous month.