Since Cemfloor is a cement based screed; floor coverings can be applied much faster than calcium sulphate screeds which needs to be dried to a final moisture content of 0.5%CM which can delay floor finishings by months.
Since cemfloor is a cement based screed; floor finishes can be applied once the screed has dried to a final moisture content of 2.5%CM; speeding up the entire build process.
Compared with other liquid screeds which generally need to be force dried with underfloor heating; Cemfloor screeds can be used in non heated floors as it doesn't require force drying to remove moisture. Using the correct tile adhesives; tiles can be placed in as little as 5 days in non- heated floors.