This was the delivery of the 3rd Story Pre-Stressed floors this was a very awkward due to the roof Beams coming down where the floors were to be placed but with a lot of cutting and sweat blood and...
Ronan Spencer Plant Hire posted this photo on our Facebook page he was very happy with the service we supplied to him in Waterford City
Doyle Concrete Conveyor Truck out on Site in Waterford Conveying Concrete to the top of the shuttering at a Farm for James Kenneally Construction, we have also of Specialist Trucks designed to make life easier for everyone working with...
2Nd Screed Job of the Day. The Crew continued back to Dunnamaggin for the next Screed Floor, this was a continuation of the job down stairs. The Screed was covering underfloor heating system this product is ideal for this...
Doyle Concrete Trucks and Crew arrived on Site @ 7.00 am and set up. We pumped the Floor Screed through the beer garden entrance for the New Floor in the Restaurant and the Long Awaited Ladies Toilets on the...
Description : This 2 story dwelling with access in the heart of Kilkenny city. With the willing neighbors and the skilled crew we managed to complete this job on a Saturday morning. 6 meters of concrete was used in...
This job consisted approximately 120m2 at 75 mm depth of our easy flow concrete. This involved 2 loads of one truck, pump truck and the Doyle concrete crew.
The job was quite a big job and it consisted of 3 floors. We supplied pre stressed 150mm floors and 4 flights of concrete stairs. Due to the scale for this project and accessibility of our concrete pumping truck...
Doyle Concrete crew arrived on site and set up levels etc for the Easy Flow Concrete, our pump truck then arrived on site and another truck they proceeded to pour the self levelling concrete mix and the crew finished...
This was an Extension to an existing building where we did the finished floor, The Doyle Concrete crew arrived on site and set up levels etc for the Easy Flow Concrete, our pump truck then arrived on site and...